VIdeos

Case Study: 23,000lbs Edmonton Air Handing Unit Install

The Prime Movers team installed these 23,000 lbs Air Handling Units at a local Dog Food Plant in Edmonton, Alberta. The team used a design/build rigging system.

More Like This

Case Study: 13,000lbs Banff Air Handling Unit Install

Case Study: 6,000 lbs Calgary Brewery HLT Tank Replacement

Case Study: Calgary SAIT CT Scanner Install

Let's Get Moving.

Or leave a message below for a free same-day response.